Fort WorthSealcoatingCrack fill · Line striping (419) 340-7759
Fort Worth and the Metroplex

Commercial sealcoating in Fort Worth

Parking lots, churches and business property across the Metroplex. The same sealer that goes on a driveway. Almost nothing else about the job is the same.

Where it goes first

A lot does not wear evenly

A driveway wears more or less all over. A lot wears in three places, and they are usually the three places nobody looks at: the drive lane, the turn at the entrance, and the ground around the dumpster.

Fort Worth sits where I-35W crosses I-30, so a lot of business property around here takes delivery trucks rather than only cars. That matters more than it sounds. A loaded trailer puts more weight through one axle than a full row of parked cars puts through an entire bay, and trailer landing gear and dumpster wheels concentrate all of it onto a few square inches of surface.

So the lanes and the pad get walked and judged separately from the parking bays. It is common for four fifths of a lot to be in good shape and the lane through the middle of it to need repair before any sealer is worth putting down.

The ground here

Fort Worth's problem is clay, not snow

Snow and ice are rare here, and a lot in Tarrant County is seldom plowed or salted. Freezing is not what breaks the asphalt.

What breaks it is the ground underneath. Through a hot, dry summer the clay shrinks and the cracks open. When the rain comes back it runs straight down those cracks, the soil swells unevenly, and one part of the lot is lifted against the next. The drive lanes, carrying the heaviest wheels, show it first.

That is the whole argument for filling cracks before the coat goes on, and before the rain returns, rather than sealing over the top and dealing with it next year.

Staying open

Sealer needs the lot empty, your business does not

Twenty four to forty eight hours before vehicles go back on it, weather depending. For most properties that is the entire problem, and the useful question is not how fast anybody works. It is when your lot is actually empty.

The answer is different for every property. A church is empty six days out of seven. A strip center is never empty but can usually give up a third of itself at a time. An office park empties on Friday evening and nothing needs it again until Monday. We ask for your traffic pattern before quoting, because it changes the price: a lot done in one go costs less than the same lot done across three visits, and that belongs on the quote where you can see it rather than buried in a total.

The season here runs April through October. A phased job booked in spring gets a choice of weekends. The same job booked for late October gets whatever the weather leaves you.

Striping

The lines come off with the old surface

Sealer covers every marking on the lot, so striping is part of the job rather than an extra. Most lots go straight back the way they were, and that is usually right.

Two things are worth twenty minutes while the paint is off. If the lot has accessible spaces they should go back to the current specification rather than wherever the old paint happened to sit, access aisle and signage included. And if you have ever wished the lot held two more cars, the only cheap moment to find out whether it can is while there are no lines on it.

We will tell you what is on the ground and what changing it would take. We will not sign anything off as compliant, because that is not ours to sign.

The honest answer

When we will tell you not to seal it

Sealer is a surface coat. It takes the ultraviolet and it keeps water out of a surface that is still sound. It does not hold a failing lot together.

If the base has gone, and the sign of that is alligator cracking through the drive lane or potholes that come back in the same spots every spring, a coat of sealer buys you a dark lot for one season and nothing underneath it. That property needs patching or an overlay first. We will say so, and tell you roughly what that involves, even though it is not the work being quoted for.

Same answer for a lot that was sealed last season and only looks tired. Sealing on a two year cycle instead of a three year one is money leaving the building for no return.

The number

How a lot gets quoted

A figure for the budget can be taken off an aerial photograph. The figure the job is booked on is walked and measured on the property, because aerials miss the strip behind the building, the islands and the loading area, the parts that move it most.

The price comes back per square foot, and it is one price. Sealing, crack filling, patching small failed spots and restriping the existing layout are all in it, so nothing is charged afterwards for stalls or feet of crack. More cracking or more striping means a higher rate, not more lines.

Occasionally a second line. A drive lane carrying truck traffic sometimes needs a second pass where the parking bays do not. That goes on as its own line, visible, so you can decide whether you want it rather than finding it inside a lump sum.

There is no charge to be measured and no obligation to book.

Who this suits

The properties we do this for

Strip retail, churches, office parks, apartment and condominium lots, self storage, medical and dental practices, and private roads run by an HOA. Anything from six stalls behind a shop up to a few acres. Arlington, Mansfield, North Richland Hills, Euless, Keller, Burleson, Bedford and the rest of the west side of the Metroplex.

Send the address and roughly what the property is. You get a measured number back, one price per square foot with the crack filling, patching and striping included, and a way of scheduling it that does not shut you down.

Call Free Quote